Tunnels

Dakota MRT Station Construction work on Dakota MRT Station (C823) using PERI's formwork system started in March 2008.
Mountbatten MRT Station The Mountbatten MRT station is part of the Circle Line project and was opened on 17 April 2010 along with Stage 1 and 2 of the Circle Line.
Paya Lebar MRT Station (C823) As part of the Circle Line project, the Paya Lebar MRT station was further expanded into an interchange linking the East-West Line and Circle Line.
Bartley MRT Station Bartley MRT Station was part of the Stage 3 Circle Line project and PERI Asia was chosen to design and supply formwork for its construction. The station was opened on 28 May 2009.
MacPherson and Tai Seng MRT Stations and Tunnel PERI was awarded Stage 2 of the Circle Line project in designing and supplying of formwork for the construction of the MacPherson and Tai Seng MRT stations, as well as 1.2 km of underground tunnel near the Tai Seng station.