PERI ASIA PTE LTD, Projects, Formwork, Scaffolding, Engineering - Hotel Ibis Singapore Novena

Current Projects

PERI ASIA PTE LTD, Projects, Formwork, Scaffolding, Engineering - Hotel Ibis Singapore Novena PERI ASIA PTE LTD, Projects, Formwork, Scaffolding, Engineering - Hotel Ibis Singapore Novena PERI ASIA PTE LTD, Projects, Formwork, Scaffolding, Engineering - Hotel Ibis Singapore Novena More Images  

Hotel Ibis Singapore Novena




A hotel development which is part of the Novena Planning Area, an urban planning zone by the Urban Redevelopment Authority, was being built at the junction of Balestier Road and Irrawaddy Road.

Hotel Ibis Singapore Novena was designed to be made up of one block of 10-storey, part 6-storey and part 2-storey.

The contractor used a variety of PERI formwork systems for its construction. CB 240 Climbing System was used for core walls, ST100 Stacking Tower for slabs and the VARIO GT 24 Girder Wall formwork system for the walls of the hotel.

By using PERI's formwork systems, the contractor was able to increase their productivity and save on manpower costs. "We were able to cast 4 walls in one day with the longest wall measuring 6.7m. If we were to use conventional formwork which have more accessories, it would have taken twice as much time", said Mr Goh Choong Wei Aazac, the Project Engineer for Kienta Engineering & Construction Pte Ltd.

The hotel opened its doors to guests in April 2011.

PERI Systems In Use
  • ST 100 Stacking Tower
  • VARIO GT 24 Girder Wall Formwork
  • CB Climbing System

  • Goh Choong Wei Aazac


    Project Engineer, Kienta Engineering & Construction Pte Ltd

    "PERI formwork system is good as it is faster and is able to solve our problems on the job site. Try it!"

    Contractor: Kienta Engineering & Construction Pte Ltd
    PERI Sales Engineer: Wong Yong Rney, HP 9455 4501
    PERI Formwork Instructor: Lim Kim Liong
    Field Service: PERI ASIA Pte. Ltd., Singapore